Project Name |
: |
U. S. Embassy Building |
Type |
: |
New Construction |
Where |
: |
Santiago, Chile |
Supplied To |
: |
Contrack-Ebasco |
Origin |
: |
U. S. A. / Egypt |
Consultant |
: |
Erickson Ellickson Associates |
Material |
: |
2 X 1000kw Diesel Generator Sets, Associated Synchronizing
And Distribution Switchgear Utility Main Incoming Switchgear |
Amount |
: |
$1,000,000.00 |
Project Name |
: |
Utilities Upgrade / Air Bases |
Type |
: |
New / Modification |
Where |
: |
Ramses and Zohar, Egypt |
Supplied To |
: |
Contrack-Ebasco |
Origin |
: |
Egypt/U.S.A. |
Consultant |
: |
U. S. Army Corp. of Engineers |
Material |
: |
Complete Electrical Distribution System, 11KV to 380V
Consist of Dist. Transformers, Switchgear, MCC, Generators, Panels
|
Amount |
: |
$1,000,000.00 |
Project Name |
: |
Bangpakong Units 3 and 4 (EGAT) |
Type |
: |
Power Plant, New Construction |
Where |
: |
Bangpakong, Thailand |
Supplied To |
: |
Mitsubishi International |
Origin |
: |
Japan |
Consultant |
: |
Black and Veatch International U. S. A. |
Material |
: |
Emergency Generating System, Diesel Generators, Switchgear,
Lighting Fixtures Explosion Proof, Misc. Materials |
Amount |
: |
$1,000,000.00 |
Project Name |
: |
Peace Shield Program, Central Maintenance
Facility, Train’g Area |
Type |
: |
New Construction |
Where |
: |
AL Kharg, Saudi Arabia |
Supplied To |
: |
Aster International (Contracting), SPA |
Origin |
: |
Italy |
Consultant |
: |
Sverdup and Parcell, St. Louis |
Material |
: |
Low Voltage Distribution, UPS System, Lighting Fixture,
Motor Control, Frequency Converters |
Amount |
: |
$2,000,000.00 |
Project Name |
: |
Kaduna Refinery |
Type |
: |
Modification Oil Refinery |
Where |
: |
Nigeria |
Supplied To |
: |
Oil Company |
Origin |
: |
Nigeria |
Consultant |
: |
N/A |
Material |
: |
2 ea. Outdoor Custom Engineers Tower Control Rooms,
Class I, Group D, Division II |
Amount |
: |
$500,000.00 |
Project Name |
: |
Distribution System Modification
|
Type |
: |
Utility Co. (U.S.A.I.D. Funded) |
Where |
: |
Alexandria, Egypt |
Supplied To |
: |
Alexandria Electricity Distribution Co. |
Origin |
: |
Egyptian |
Consultant |
: |
Harza Engineering |
Material |
: |
High Voltage Lighting Arresters & Grounding Resistors/SQ.CO.
|
Amount |
: |
$800,000.00 |
Project Name |
: |
General Supply |
Type |
: |
Electricidad De Caracas |
Where |
: |
Caracas, Venezuela |
Supplied to |
: |
Trading Co. |
Origin |
: |
U.S. A. |
Consultant |
: |
N/A |
Material |
: |
33KV Gas-Filled Splicing Kits, MAC Products, Inc. |
Amount |
: |
$300,000.00 |
Project Name |
: |
Peace Shield Program, 5 EA Sector
Command Centers |
Type |
: |
New Construction |
Where |
: |
5 Locations, Saudi Arabia |
Supplied To |
: |
Ballast Nedam Groep/Holland Ret-Ser Engineering/Taiwan
Sam Whan/Korea Bes Engineering/Taiwan |
Origin |
: |
Various |
Consultant |
: |
Sverdrup And Parcell, St. Louis, MO. |
Material |
: |
Distribution Sub-Stations, Frequency Converters, Control
System Equipment, Panelboards, Lighting Fixtures, Various Materials
|
Amount |
: |
$5,000,000.00 |
Project Name |
: |
Bachelor Officers Quarter |
Type |
: |
New Construction |
Where |
: |
Guantanamo Bay, Cuba |
Supplied To |
: |
Electrical Contractors/Stenska Procon. Ltd. |
Origin |
: |
Canadian |
Consultant |
: |
Roicc S. Navy |
Material |
: |
Complete Electrical Package, Standby Generator, Conduit
Fittings, Cables, Panels, Lighting, and Fire Alarm, Sound Systems.
|
Amount |
: |
$750,000.00 |
Project Name |
: |
Peace Shield Program, 17 EA Long
Range Radar Sites |
Type |
: |
New Construction |
Where |
: |
Eastern Province, Saudi Arabia |
Supplied To |
: |
Al Harbi Const., Saudi Arabia Al Thuhama Const., Saudi
Arabia Shinsung, Korea Ret Ser Eng., Taiwan You One Const., Korea
|
Origin |
: |
Various |
Consultant |
: |
Sverdrup And Parcell, St., Louis, MO |
Material |
: |
Distribution Sub-Stations, Frequency Converters, Control
System Equipment, Panelboards, Lighting Fixtures, Various Materials
|
Amount |
: |
$3,000,000.00 |
|
Project Name |
: |
Communication Site Facilities (Peace
Shield) |
Type |
: |
New Construction |
Where |
: |
Various Locations, Saudi Arabia |
Supplied To |
: |
Shinsung Corp. |
Origin |
: |
Korea |
Consultant |
: |
Sverdrup And Parcell, St. Louis, MO. |
Material |
: |
Low Voltage Distribution Equipment, Lighting Disconnect
Switches, Motor Control, Grounding Uninterruptable Power Supply,
Frequency Converters |
Amount |
: |
$5,000,000.00 |
Project Name |
: |
Equipment Supply |
Type |
: |
Electric Utility Company |
Where |
: |
Manila, Philippines |
Supplied To |
: |
Cagayan Electric Power |
Origin |
: |
N/A |
Consultant |
: |
N/A |
Material |
: |
10 MVA Transformers, Pole Line Hardware, Distribution
Equipment, Electrical connectors, Pole type Distribution Transformers
|
Amount |
: |
$1,500,000.00 |
Project Name |
: |
Satcom (Standby Power for Satellite
Communications) |
Type |
: |
Electrical Contractor |
Where |
: |
Clark Field, Philippines |
Supplied To |
: |
Meiscor, Inc. |
Origin |
: |
Philippines |
Consultant |
: |
Roicc Pacific |
Material |
: |
3 Low Speed Synchronized 1200KW Diesel Generator Sets,
Complete w/Synchronizing Switchgear and High voltage Switchgear
|
Amount |
: |
$1,000,000.00 |
Project Name |
: |
Electrical Supply Standard |
Type |
: |
Operations and Maintenance |
Where |
: |
Various, Indonesia |
Supplied To |
: |
Oil Company |
Origin |
: |
Indonesia |
Consultant |
: |
Various |
Material |
: |
Transformers, Power Transmission, Distribution Switchgear
600V, 15KV, Wire and Cables Lighting Arresters |
Amount |
: |
$1,500,000.00 |
Project Name |
: |
Upgrade Utilities |
Type |
: |
Open Pit Mine |
Where |
: |
Beijing, China |
Supplied To |
: |
Shoudu Iron And Steel Corp. |
Origin |
: |
China |
Consultant |
: |
Owner |
Material |
: |
Portable, Skid Mounted 34.5KV – 4.16 Open Pit Mining
Substation, including Design and Installation |
Amount |
: |
$250,000.00 |
Project Name |
: |
Polyester Factory |
Type |
: |
New Construction |
Where |
: |
Beijing, China |
Supplied To |
: |
National China Resources |
Origin |
: |
China |
Consultant |
: |
Dow Chemical, Houston, Texas |
Material |
: |
Medium Voltage Distribution, Motor Control Centers,
Panelboards, Transformers |
Amount |
: |
$500,000.00 |
Project Name |
: |
Security Lighting Upgrade |
Type |
: |
New Construction |
Where |
: |
Rota Naval Base, Spain |
Supplied To |
: |
Feransa, SA |
Origin |
: |
U. S. A. |
Consultant |
: |
U. S. Navy |
Material |
: |
Substation, Panelboard, Architectural Lighting, Conduit
and Cables |
Amount |
: |
$300,000.00 |
Project Name |
: |
Upgrade and Maintain Facilities in
Antarctica |
Type |
: |
Operation and Maintenance |
Where |
: |
Various, Antarctic |
Supplied To |
: |
I.T.T. Antarctic Services, Inc. |
Origin |
: |
U. S. A. |
Consultant |
: |
Syska & Hennesey |
Material |
: |
Pole Line Hardware, Transmission Line, Standard Electrical
Materials, Panelboards, Substations and Kindred Items |
Amount |
: |
$2,000,000.00 |
Project Name |
: |
Jamaya Mosque |
Type |
: |
New Construction |
Where |
: |
Saudi Arabia |
Supplied To |
: |
General Contractor |
Origin |
: |
Korean |
Consultant |
: |
N/A |
Material |
: |
Square D Bus Duct to 2000 AMP |
Amount |
: |
$2,300,000.00 |
Project Name |
: |
Replace Hydrant Refueling |
Type |
: |
Alternation |
Where |
: |
Lajes Field, Azores (U. S. Air Force) |
Supplied To |
: |
Electrical Contractor |
Origin |
: |
Portuguese |
Consultant |
: |
Sverdrup |
Material |
: |
Standby Diesel Generator (300KW), Wire and Cables,
Cathodic Protection System, Fire Alarm System, Miscellaneous Electrical
|
Amount |
: |
$400,000.00 |
Project Name |
: |
Alter/Repair Airfield Vault |
Type |
: |
Alternation |
Where |
: |
Lajes Field, Azores (U.S. Air Force) |
Supplied To |
: |
Electrical Contractor |
Origin |
: |
Portuguese |
Consultant |
: |
Sverdrup |
Material |
: |
Standby Diesel Generator Set 375KW, Airfield Vault
Equipment from Crouse Hinds Airport LTG Group, such as Constant
Current Regulators (to 50KW), Control Equipment for Both Control
Tower and the Airfield Vault, Switchboard, Panelboards from Westinghouse
Electric, Miscellaneous Electrical Materials such as Wire and Cable
|
Amount |
: |
$1,000,000.00 |
Project Name |
: |
Islamic Development Bank |
Type |
: |
New Construction |
Where |
: |
Jeddah, Saudi Arabia |
Supplied To |
: |
Joint Venture- Taylor Woodrow, UK Aster International,
Milan Juffali S.A. |
Consultant |
: |
Japan |
Material |
: |
1000KW Diesel Generator, Generators Switchgear, Low
Voltage Distribution Equipment, Panelboards, Motor Control Panels,
Busduct, Underfloor Duct, Paging and Sound System, CCTV System,
MATV System |
Amount |
: |
$4,000,000.00 |
Project Name |
: |
Peace Vector IV Phase 2 |
Type |
: |
Main Operating Base Upgrade |
Where |
: |
Sakara, Egypt |
Supplied To |
: |
Electrical Contractor |
Consultant |
: |
Burns & McDonnell |
Material |
: |
Low Voltage Distribution Equipment, Panelboards, Motor
Control Panels, Busduct, Transformers, Lighting Fixtures, Airfield
D.C. Power Supplies, Motor Generator Sets, Frequency Converters,
Cable Racks, PVC Conduit & Fittings, Rigid Steel Conduit. |
Amount |
: |
$5,000,000.00 |
Project Name |
: |
Horst Power I, Horst Power II Barges
and Land Based Substation |
Type |
: |
Each Power Barge 60MW |
Where |
: |
Philippines |
Supplied |
: |
Van Der Horst |
Consultant |
: |
Van Der Horst |
Material |
: |
115KV Switches, CTs, PT, Lighting Arresters Transformers,
Cable, Connectors, 115 KV Breakers |
Amount |
: |
$2,500,000.00 |
Project Name |
: |
Trans-Caucasian Embassy Renovations
|
Type |
: |
Building Renovations |
Where |
: |
Newly Independent States in the Former Soviet Union
|
Supplied To |
: |
Bill Harbert International Construction Co. |
Consultant |
: |
U. S. Department of State, FBO |
Material |
: |
All Architectural Requirements for Four Building Renovations
including Appliances, Carpeting |
Amount |
: |
$450,000.00 |
Project Name |
: |
Power & Desalination Plant |
Type |
: |
New construction |
Where |
: |
Ascension Island |
Supplied To |
: |
Caddell Construction Co. |
Consultant |
: |
U. S. Air Force / U. S. Navy, SO. Division |
Engineer |
: |
Robert & Co., Atlanta, Georgia |
Material |
: |
Transformers, General Control Panel, MCC, Cables, Lighting
|
Amount |
: |
$1,975,000.00 |
Project Name |
: |
EDOP Gas Injection Project |
Type |
: |
Offshore Platform/New Construction |
Where |
: |
Nigeria |
Supplied To |
: |
Hyundai Heavy Industries Co., Ltd. |
Consultant |
: |
Mobil Oil |
Material |
: |
Power/Control & Instrument Cable, Lighting Fixtures
|
Amount |
: |
$1,400,000.00 |
Project Name |
: |
RAVVA Oil & Gas Project / On
Shore Refinery |
Type |
: |
New Construction |
Where |
: |
India |
Supplied To |
: |
Hyundai Heavy Industries Co., Ltd. |
Consultant |
: |
Mustang Engineering |
Material |
: |
Switchgear, MCC, Transformers, Busduct |
Amount |
: |
$720,000 |
Project Name |
: |
Pemex Refinery / CCR Project |
Type |
: |
New Construction |
Where |
: |
Madero, Mexico |
Supplied To |
: |
Sunkyong Engineering & Construction Co. |
Consultant |
: |
Pemex, Medico |
Material |
: |
Power & Control Cable, Instrument Cable, Lighting
Fixtures, Conduit, Explosion Proof Fittings, Fire Alarm |
Amount |
: |
$430,000.00 |
Project Name |
: |
Meralco (Manila Electric Company)
|
Where |
: |
Manila, Philippines Poles for Transmission and Distribution
Lines in Accordance with ANSI & A WPA Ranging from Class 1 to
9 and Sizes 25’ to 90’ in Length |
Amount |
: |
$10,000,000.00 |
|
Project Name |
: |
Uniwide |
Where |
: |
Manila, Philippines |
Consultant |
: |
Uniwide |
Supplied |
: |
Distribution Power Transformers Range from 300 KVA
to 5000 KVA |
Amount |
: |
$750,000.00 |
Project Name |
: |
National Bank of Dubai Headquarters
|
Where |
: |
Dubai, United Arab Emirates |
Supplied To |
: |
Complete Indoor & Outdoor Lighting Package |
Consultant |
: |
Norr Consultants, GSM Consultants |
Amount |
: |
$1,010,000.00 |
Project Name |
: |
Southern High School |
Where |
: |
Santa Rita, Guam |
Supplied To |
: |
Complete Indoor & Outdoor Lighting Package Athletic
Field Lighting, High Mast Poles |
Consultant |
: |
Ssang Young Const. Co. Ltd. |
Amount |
: |
$1,050,000.00 |
Project Name |
: |
P33 & P35 FPSO Project |
Type |
: |
Shir Renovation & Reconfiguration |
Where |
: |
Brazil |
Supplied To |
: |
Hyundai Heavy Industries Co., Ltd. |
Owner |
: |
Petrobas, Brazil |
Material |
: |
Switchgear, MCC, Transformers, Panelboards |
Amount |
: |
$3,720,000.00 |
Project Name |
: |
U. S. Embassy |
Where |
: |
Buenos Aires, Argentina |
Material |
: |
Various Construction Materials |
Consultant |
: |
FDE, Ltd. |
Amount |
: |
$300,000.00 |
Project Name |
: |
U. S. Embassy |
Where |
: |
Ankara, Turkey |
Supplied To |
: |
EMTA Construction |
Material |
: |
Various Construction Materials |
Amount |
: |
$220,000.00 |
Project Name |
: |
U. S. Embassy |
Where |
: |
Islamabad, Pakistan |
Supplied To |
: |
Astron Construction |
Material |
: |
Various Construction Materials |
Amount |
: |
$980,000.00 |
Project Name |
: |
Dubai International Airport |
Where |
: |
Dubai, U.A.E. |
Supplied To |
: |
Kharafi International |
Material |
: |
Electrical Package systems |
Amount |
: |
$5,780,000.00 |
Project Name |
: |
Sagami General Depot |
Where |
: |
Sagami, Japan |
Supplied To |
: |
Fujita Construction Co., Ltd. |
Material |
: |
Mechanical & Architectural Equipment |
Amount |
: |
$680,000.00 |
Project Name |
: |
F-16 Depot Facilities |
Where |
: |
Helwan, Egypt |
Supplied To |
: |
Encorp International |
Material |
: |
Mechanical, Architectural and Electrical |
Amount |
: |
$3,050,000.00 |
|
Project Name |
: |
U. S. Embassy |
Where |
: |
Dhaka, Bangladesh |
Supplied To |
: |
Mascot Builders, Ltd. |
Material |
: |
Architectural, Mechanical and Electrical materials
|
Amount |
: |
$965,000.00 |
Project Name |
: |
Al Mansoura Waste Water Project |
Where |
: |
Mansoura, Egypt |
Supplied To |
: |
ABB Susa, Inc. |
Material |
: |
Generator and Switchgear |
Amount |
: |
$965,000.00 |
Project Name |
: |
American International School Project
|
Where |
: |
Dhaka, Bangladesh |
Supplied To |
: |
Mir Akhter Hossain Ltd. |
Material |
: |
Mechanical, Electrical and Architectural equipment
|
Amount |
: |
$788,000.00 |
Project Name |
: |
Piarco International Airport – New
Terminal Building |
Where |
: |
Trinidad, West Indies |
Consultant |
: |
Birk – Hillman |
Material |
: |
15 Kv and LV Switchgear, Lighting, Fire Alarm System,
P. Cable |
Amount |
: |
$2,175,000.00 |
Project Name |
: |
Harborside Atlantis Hotel |
Where |
: |
Nassau, Bahamas |
Consultant |
: |
Thompson |
Material |
: |
MV & LV Switchgear, 15 Kv & Lv cables, Lighting,
Fire Alarm Sys |
Amount |
: |
$800,000.00 |
Project Name |
: |
Cadereyta Refinery Project |
Where |
: |
Cadereyta, Mexico |
Supplied To |
: |
Siemens (KWU) / Sunkyong, Joint-Venture. |
Material |
: |
Explosion proof conduit, fittings, RGS conduit, Instrumentation
tubing and fittings, Globe valves |
Amount |
: |
$8,250,000.00 |
Project Name |
: |
Madero Refinery Project |
Where |
: |
Madero, Mexico |
Supplied To |
: |
Siemens (KWU) / Sunkyong, Joint-Venture |
Material |
: |
PVC conduit and fittings for infrastructure |
Amount |
: |
$3,400,000.00 |
|
|